Sanger Metal

Alloy Fittings Assembly

 

HOW TO ASSEMBLE AN S-1325 COUPLER LINK
HOW TO ASSEMBLE A CROSBY CLEVIS TYPE FITTING



1. Slide Coupler Lank over Engineered Flat of Master Link.


1. Place chain link into clevis of chain coupler. Insert pin fullv into the clevis ears.



2. Rotate Coupler Link so that clevis fitting is to the outside of Master Link and attach to chain sling.


2. Place the coupler link on its side and using a hammer, drive the locking pin into the clevis ear until it is flush with the outside surface.


HOW TO ASSEMBLE A LOK-A-LOY® CONNECTING LINK
HOW TO ASSEMBLE LOAD PIN IN CROSBY ELIMINATOR FITTINGS



1. Place the locking sleeve between the assembled half link forgings.


1. Place both chain links into clevis slots of fitting, insert pin fully into the two-leg clevis.



2. Drive the pin through the assembled link ends and sleeve until the end of the pin is flush with the outside of the connecting link halves.


2. Place Eliminator assembly on a firm surface. Using a hammer, drive the locking pin into the two-leg clevis until it is flush with the top of the hole.

 

 

 

Drukuj
Projekt i realizacja, hosting: Stopklatka.pl
www.sangermetal.com